Challenging project with massive grade changes, creative stormwater management practices, and detailed coordination with existing abutting auto dealerships.
Expansive irrigation improvements including new pumphouse and intake, pond outlet structures with water level controls, and pond dredging.
Interesting project to renovate and expand a busy restaurant to accommodate the growing business. Featured design of a new outdoor dining area and drive-through realignment for better site circulation.
Exciting project utilizing low-impact stormwater management techniques such as bioretention areas (rain gardens) and bituminous porous pavement.
Developed plans for parking lot expansion for one of the most historically significant and recognizable buildings in Worcester.
Extensive wastewater treatment plant upgrades utilizing a first of its kind in the United States innovative technology.
Unique residential mill conversion project of a historic building straddling the Kettle Brook River. Challenging design incorporated a new bridge spanning the river to access the rear of the property.
Construction administration services for a major road improvement project on Rt. 146 in Sutton, MA.
Detail topographic survey to locate wells for West Boylston Water Commission
Helping another business grow...commercial site design to expand an existing distribution facility.
Revitalizing our community...commercial redevelopment of an abandoned building into a professional office space. Complete site rehabilitation.
Parking lot expansion and improvements to meet the needs of popular dining destination.
Site redevelopment and rehabilitation to create a child care resources center at the corner of a busy intersection.
Let us help complete your in-progress projects...surveying and coordination for local and state project acceptance.
Significant project involving expansion to an existing historic building dedicated to preservation of American history. Challenging design included large grade changes and special attention to aesthetics.
Important resource protection project for Central Massachusett's premier wildlife education facility.
Exciting project to construct a multi-purpose athletic field complex on campus. Design incorporating coordinating athletic elements to meet NCAA and other regulatory standards.
Extensive, multi-phase project to connect the facility to municipal sewer to support current needs and future growth.
Challenging project to upgrade an existing circa 1860 pump station and carry wastewater across a river and up a very steep grade.
Extensive site design project for a new municipal fire and police facility incorporating a large stormwater infiltration system within a protected watershed.
Innovative and alternative large septic system design incorporating drip dispersal fields and wastewater pretreatment on a site with a history of septic system issues.
Expansive project with sediment and erosion control issues prior to our involvement. With our assistance, the site maintained construction stormwater runoff compliance for the remainder of the project.
Provided municipal peer-review services and construction administration services.
Comprehensive sewer feasibility study for potential development of 300 acres of undeveloped land in the towns of Sutton and Northbridge.
Complex site design on a site with asbestos contaminated soils. Detailed drawings and specifications were required for all site work with regard to the soil disturbance.
Construction survey stakeout of a network of helical piles for foundation support of a new building addition.
Stormwater system design and extensive construction survey stakeout for construction of a new elementary school.
Rewarding project to construct a support center for childhood cancer patients and their families. Special site design considerations were taken to achieve a relaxing, retreat appearance.
Remarkable project to create a hilltop retreat for Buddhist studies. The project required a nearly two-mile long water main and booster pump station to provide water service.
Extensive site design and innovative stormwater management practices for a luxury automobile dealership, the third of the Wagner Motors complex in Shrewsbury.
Innovative and alternative large septic system design incorporating drip dispersal fields and wastewater pretreatment on a congested site with several existing septic systems.